What the Old Triple R Ranch Tells Farm Buyers Near Franklinton

Gently rolling autumn pasture with a small reflective farm pond and a cream barn against an oak and pine tree line in rural North Carolina.

For years, couples in Franklin County held their weddings at Triple R Ranch, a horse farm and event venue on Cedar Creek Road just south of Franklinton. On April 15, 2025, the Franklinton Board of Commissioners rezoned that land for a 3,480-unit development called Triple B. During the public hearings that night, one attendee asked the board to save an existing barn because of the property's history as a horse farm, according to the town minutes summarized by Wake Forest Matters.

If you are a Raleigh-area buyer looking for a horse property or a small farm along the US 1 corridor, the Triple R story tells you how farmland near Franklinton actually changes hands and changes use. It is a slow process. What sets the pace, here and on the tracts you might be looking at, is how much water the county can supply, where its sewer pipe runs and how much traffic US 1 can carry.

Nine Years From Deed to Water

The ranch did not turn into a subdivision overnight. The public record shows how long each step took.

  1. On January 6, 2017, Triple R Ranch, Inc. deeded the core 615.826 acres to Triple B Ranch and Farm, LLC, a Henderson company owned by the Boyd family. An adjoining 7.037-acre parcel was deeded the same day.
  2. On January 29, 2018, the owners added a 3.28-acre parcel.
  3. On April 15, 2025, Franklinton approved three items, each by a 5 to 0 vote: a rezoning from Agricultural R-1A and Residential Single Family Medium to Planned Development, a master development plan, and a development agreement. The agreement was recorded on May 7, 2025.
  4. On August 17, 2026, Franklin County commissioners authorized their manager to sign a separate utility development agreement covering water and sewer for the project.

That is more than eight years from sale to rezoning and more than nine years from sale to a utility deal. The county's estimated schedule calls for about 200 certificates of occupancy a year from 2027 through 2030, with full buildout by 2045. At that pace, roughly 800 of the 3,480 units would be finished by the end of 2030, and the rest would come over the following fifteen years.

For a buyer, that timeline cuts both ways. A farm next to a tract like this one may sit beside open land for years after a rezoning makes the news. When construction does start, it can go on for two decades.

The Gallons Decide

Franklinton does not run its own water and sewer system. Franklin County Public Utilities serves the town, and most of the county's water is bought from the City of Henderson under a Kerr Lake supply contract. The county's May 2024 utilities update reported the following:

  • Total county water supply for 2024 was 5.1 million gallons a day, with roughly 930,000 gallons uncommitted.
  • The wastewater plant near Youngsville is permitted for 3 million gallons a day. As of May 2024 it had average daily flow of 1,286,000 gallons and 1,714,000 gallons of available capacity.

The Triple B agreement caps the county's commitment at 479,100 gallons per day each for water and sewer. That works out to roughly 138 gallons per unit. Measured against the May 2024 figures, one project accounts for about half of the uncommitted water and a little over a quarter of the plant's available sewer capacity. Those 2024 numbers have certainly shifted since then, since other projects draw on the same system. Still, the proportion shows how few projects of this size the current system can take on at once.

For anyone looking at farms in western Franklin County, a tract's distance from county water and sewer lines, and whether a nearby project is paying to extend them, says a great deal about how soon the land around it is likely to change.

Rolling Meadows Follows the Same Pattern on Hicks Road

Triple B is not the only project on this side of the county. In Youngsville, the Rolling Meadows plan covers about 351.48 acres between Fleming and Hicks roads, with approximately 1,065 housing units. Its rezoning was approved in 2022, and a town development agreement hearing appeared on Youngsville's August 14, 2025 agenda.

Here too, new pipe and new road arrived with the project. Franklin County's January 6, 2025 agenda set a public hearing on a Rolling Meadows utility agreement. The incentives it listed included a developer-built segment of the Youngsville bypass and a sewer outfall, valued at up to $1 million. Hicks Road appears in both projects, which puts one road between Youngsville and Franklinton at the edge of about 960 acres planned for more than 4,500 homes.

A sewer outfall built for one subdivision can make the next tract over easier to serve. That is why a farm's neighbors along this corridor matter as much as the farm's own soils and fencing.

Roads Set the Pace Too

Even with water in hand, traffic limits how quickly the corridor can fill in. State traffic counts put roughly 22,000 vehicles a day on US 1 at Franklinton, rising toward 39,500 near the Wake County line. NCDOT's Capital Boulevard upgrade to six lanes from I-540 through Wake Forest is scheduled to begin construction in 2031. North of that, through Youngsville to Franklinton, US 1 stays four lanes with no funded widening.

Triple B will design and build two lanes and a sidewalk of the planned Franklinton Southern Bypass along its own frontage. That means dedicating 7,910 linear feet, or 19.61 acres, of right-of-way, at a construction cost of about $1.9 million. Karen Kemmerhecht, representing Triple B, told county commissioners that for now it is "a bypass that goes to nowhere," according to Wake Forest Matters. The current 2026-2035 regional transportation program includes no construction funding for the rest of the bypass. CAMPO's fiscal year 2027 work program does include a $100,000 alignment study to find a feasible route and possible connection points to US 1.

For a farm buyer south and west of Franklinton, that study matters. Until an alignment is chosen, nobody can say which road frontages along this stretch will end up next to a four-lane bypass.

What Residents Asked the North Falls Study For

On September 14, 2026, Franklin County commissioners voted unanimously to adopt the North Falls Lake Area Study, a CAMPO-led plan that covers western Franklin County, southern Granville County and northern Wake County. Its preferred scenario steers development toward existing communities and key corridors and protects rural areas, watersheds, trees and open space. More than 500 surveys went into it. The project's consultant told the county planning board on August 11, 2026 that residents wanted to keep the area's rural character while also gaining more local businesses and amenities.

The study also included a detailed look at NC 56 between Creedmoor and Franklinton, the road whose planned Southern Bypass runs along the Triple B frontage. For a farm buyer, the survey result is a useful read on the neighbors: the people already living in western Franklin County told planners they value the rural character that drew a horse farm like Triple R to Cedar Creek Road in the first place.

Reading a Farm on This Corridor

For a buyer comparing a 20-acre horse property near Franklinton with something closer to Louisburg, the Triple R record suggests a few practical questions to answer before an offer:

  • How far is the tract from Franklin County water and sewer lines, and is any outfall or extension tied to a nearby project?
  • What is the phase schedule of any large approved project within view of the property? Construction measured in decades affects daily life on a farm differently than a single build-out would.
  • Does the road frontage fall anywhere near the corridor the Franklinton Southern Bypass study will examine?
  • Does the land sit near the communities and corridors the North Falls study points growth toward, or in the rural areas it hopes to protect?

Farm-scale land farther east has also attracted public buyers. In January 2025, Franklin County agreed to buy 127.88 acres off US 401 North near Louisburg for $1,545,240, which works out to about $12,084 an acre. The Franklin Times reported in its 2025 year-in-review that the county had not disclosed its intended use by year's end. That is a single public purchase, not a farm sale. Even so, it is a recent recorded price for open acreage near the county seat. For a closer look at how the two towns have developed in different directions, see our post on why Franklinton and Louisburg stopped being the same kind of downtown. Owners weighing their own options can read whether to subdivide Franklin County acreage.

Questions Buyers Ask About Franklinton-Area Farms

Will the 1840s house and pond at Triple B stay? The plan includes a roughly 32-acre public park around an existing pond and the 1840s-era house facing Cedar Creek Road. The developer is offering to dedicate both to the Town of Franklinton, along with a three-acre site for an EMS and fire station.

When will the first Triple B homes be finished? The county's estimated schedule starts certificates of occupancy in 2027, at roughly 200 a year through 2030, with full buildout by 2045.

What else is planned on the Triple B land besides homes? The master plan sets aside 52.9 acres for commercial use and roughly 50 acres for manufacturing, office and research uses along the CSX rail corridor.

The questions on that list, from the nearest county water line to the bypass study route, are the ones a Franklinton-area farm should be measured against before an offer. Legacy Farms and Ranches is a land-specialist team that works with buyers and sellers of horse farms and acreage between Youngsville, Franklinton and Louisburg. Explore our Franklin County properties, or Talk to a Land Specialist.